Control System Optimization

Comprehensive supervision and execution of full-scale rehabilitation works for two critical refinery units:

  • Unit 201 – Distillation Vacuum Uni
  • Unit 105 – Oil Hydrotreating

The project covered the entire requalification and commissioning process — starting with precise cable rewiring, complete instrumentation and control system integration, and ending with a fully functional and stable startup for both units.

A key element of the project was the remediation of flow blockages caused by carbonization of hydrocarbon residues, which were resolved using targeted mechanical and chemical techniques. These interventions ensured full flow recovery, system cleanliness, and minimized risk of recurrence.

All work was performed under strict technical standards, guaranteeing:

  • Enhanced control system performance
  • Operational safety and stability
  • Reliable long-term performance
  • Recovery of system throughput and minimized unscheduled shutdowns

This level of execution makes the service ideal for investors and technical stakeholders looking for:

  • Proven engineering reliability
  • End-to-end technical assurance
  • A capable partner for large-scale oil & gas rehabilitation projects
No items found.

Other Services

Let's work together!

We’re committed to excellence in every interaction. Expect a thoughtful response shortly.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.